International Chemical Manufacturing Company

Demolished 15 building structures, removed 3000 CY of concrete, removed 18 USTs ranging in size up to 25,000 gallons, excavated and backfilled 15,000 cubic yards of soil. Contaminates included Petroleum, solvents and PCBs. Disposed of over 50,000 gallons of contaminated groundwater and operated treatment system.