Provided turnkey UST Services. Excavated, Cleaned, Disposed and/ or Abandoned 17 USTs ranging in size from 1000 to 10,000 gallons. Performed restoration of sidewalk areas in conjunction with regular food delivery schedules. Excavated and disposed of 980 tons contaminated soil.
Excavated, Cleaned & Removed 8 USTs ranging in size from 1,000 to 10,000 gallons at two NJ sites. Excavated and disposed of 800 tons of contaminated soils. Projects performed without interruption of delivery activities.
Removed lead contamination from 65,000 square feet of three floor manufacturing facility. Project utilized 9 man crew, air monitoring and full decontamination procedures. Project completed ahead of schedule with wipe sample results below required limits.
Excavated, cleaned and removed (8) 12,000 gallon solvent tanks. Demolished, excavated and backfilled three former lagoons containing contaminated soil. Transported and disposed of 35,000 gallons of liquid hazardous waste and 1,100 tons of contaminated soil.
Removed product and cleaned 62 storage tanks containing asphalt and asphalt emulsions at three Northeastern and Central PA facilities. Project necessitated manual removal of hardened asphalt and was completed ahead of schedule in winter months.
Manually removed 2000 gallons of gelled ester material from reactor vessel. Project was completed in 5 working days and allowed production to resume ahead of schedule. Over 1800 pounds of material removed per day.