Project History
Client: |
International Chemical Manufacturing Company |
Type: |
Demolition and Site Remediation |
Summary: |
Demolished 15 building structures, removed 3000 CY of concrete, removed 18 USTs ranging in size up to 25,000 gallons, excavated and backfilled 15,000 cubic yards of soil. Contaminates included Petroleum, solvents and PCBs. Disposed of over 50,000 gallons of contaminated groundwater and operated treatment system. |
Cost: |
$2.04 million (ongoing) |
Client: |
Consultant for Major Retail Fuel Company |
Type: |
Treatment System Installation |
Summary: |
Provided Emergency Installation of groundwater remediation system piping and hardware. Project involved coordination with other contractors, local law enforcement, traffic safety and retail station owner. Connected 14 wells to treatment system on commercial, residential and municipal properties. |
Cost: |
$135,000.00 |
Client: |
Metro NJ Baked Goods Manufacturer |
Type: |
UST Removal and Abandonment |
Summary: |
Provided turnkey UST Services. Excavated, Cleaned, Disposed and/or Abandoned 17 USTs ranging in size from 1000 to 10,000 gallons. Performed restoration of sidewalk areas in conjunction with regular food delivery schedules. Excavated and disposed of 980 tons contaminated soil. |
Cost: |
$395,000.00 |
Client: |
Former Pigment Manufacturing Facility |
Type: |
Decontamination and Interior Demolition |
Summary: |
Provide tank cleaning, decontamination, and waste disposal of all process and handling equipment in the facility. Then demolished and removed all equipment. Activities included rigging, dismantling and loading of 800 tons of scrap material. |
Cost: |
$765,000.00 |
Client: |
Major NJ Newspaper Delivery Service |
Type: |
UST Removal/Remediation |
Summary: |
Excavated, Cleaned & Removed 8 USTs ranging in size from 1,000 to 10,000 gallons at two NJ sites. Excavated and disposed of 800 tons of contaminated soils. Projects performed without interruption of delivery activities. |
Cost: |
$142,000.00 |
Client: |
Fortune 50 Petrochemical Company |
Type: |
Lead Removal and Decontamination |
Summary: |
Removed lead contamination from 65,000 square feet of three floor manufacturing facility. Project utilized 9 man crew, air monitoring and full decontamination procedures. Project completed ahead of schedule with wipe sample results below required limits. |
Cost: |
$87,500.00 |
Client: |
Consultant for Commercial Real Estate Developer |
Type: |
UST Removal, Lagoon Closure |
Summary: |
Excavated, cleaned and removed (8) 12,000 gallon solvent tanks. Demolished, excavated and backfilled three former lagoons containing contaminated soil. Transported and disposed of 35,000 gallons of liquid hazardous waste and 1,100 tons of contaminated soil. |
Cost: |
$197,400.00 |
Client: |
General Contractor for Municipal Water Commission |
Type: |
Emergency Pump and Treatment System Installation |
Summary: |
Performed emergency pumping, storage and treatment for over 700,000 gallons of petroleum contaminated water from water main break. Staged (5) 20,000 gallon storage tanks for implementation of 100,000 gallon oil-water separator system. Coordinated discharge of treated water to local sewerage authority. Monitored pump and treatment progress around the clock for 3 weeks. Installed automatic system to pump and treat water in the excavation after bulk of the discharge was contained. |
Cost: |
$82,300.00 |
Client: |
Consultant for Major Chemical Manufacturing Facility |
Type: |
RCRA Tank Closure and PCB Decontamination |
Summary: |
Cleaned and performed sampling on 17 chemical process and storage tanks. Tanks contained unknown materials. Performed PCB decontamination on steel platforms utilizing scaffolding and detergent scrubbing. Reduced PCB levels below 100ppm. Characterized, transported and disposed of 69 drums of waste material. |
Cost: |
$47,824.00 |
Client: |
Northeast Building Products Manufacturer |
Type: |
Tank Cleaning and Product Removal |
Summary: |
Removed product and cleaned 62 storage tanks containing asphalt and asphalt emulsions at three Northeastern and Central PA facilities. Project necessitated manual removal of hardened asphalt and was completed ahead of schedule in winter months. |
Cost: |
$118,000.00 |
Client: |
Major Spill Cleanup Cooperative |
Type: |
Emergency Spill Response |
Summary: |
Summary: Supplied labor and equipment to perform beach cleanup at major tourist sites along the Delaware River. Project entailed 12 men for 15 consecutive days, 16 hours per day. Supplied labor and equipment for 20 consecutive days to performn cleanup in Portland, ME harbor area. |
Cost: |
$67,475.00 |
Client: |
Chemical Manufacturing Facility |
Type: |
Tank Cleaning and Product Removal |
Summary: |
Manually removed 2000 gallons of gelled ester material from reactor vessel. Project was completed in 5 working days and allowed production to resume ahead of schedule. Over 1800 pounds of material removed per day. |
Cost: |
$28,600.00 |
Client: |
Major Pesticide Manufacturing Company |
Type: |
Tank Cleaning |
Summary: |
Cleaned 8 storage tanks containing pesticide residue. Tanks ranged in size from 30,000 to 100,000 gallons. All tanks were cleaned to product change standards, rinse waters sampled and analyzed. Scaffolding was erected in the tank interiors to allow walls and ceilings to be cleaned. Reduced levels of malathion from 2600 ppm to 13 ppm. |
Cost: |
$52,300.00 |